The County will be performing pot holes at various locations within the proposed sewer collection system area for the Port Hadlock Sewer Facility project on Friday, June 16, 2023. A vac truck will be used to pothole the utility conflict area; there are approximately 20 locations. The work will take place within county or state rights-of-way. The purpose of the pothole investigation is to find and identify any existing utility conflicts which will then be incorporated in to the proposed low pressure sewer collection system design. View this PDF to see a map of the locations.